Construction Milestones
January 2001
- Dedication
August 2000 - Library opening
July 19, 2000 - Move of Library Collection
July 17, 2000 - Move of Library furniture
June 30, 2000 - Delivery of first furniture to Zief
February -
March, 2000
-Interiors work ongoing
January 21, 2000 - Placement of the pre-cast panel with library name:
Dorraine Zief Law Library
January 2000
- Pre-Cast concrete exterior panels placed
November 5, 1999 - "Topping Out" Party as last steel beam is
placed.
October 1999
- October 2: poured first portion of concrete slab on grade - October
11: poured
second part of concrete slab - October 14: completed pour of slab on
suspended platform -
October 19, 1999 Steel arrives and steel erection begins.
September 1999
- Pour of concrete for crawlspace - Site work & excavation completed &
preparation for 1st for slab pour ongoing - Sewer, water and vent lines for
restrooms, drain
lines and hydraulic lines for elevators installed - Main lower level electrical
and data conduit
lines trenched, installed and backfilled - Electrical floor boxes were laid
out and installed.
August 1999 - Drilling and forming of structural piers completed - Installation
of pipes for
plumbing and electric conduit begun - Construction of stair on east end of site
begun.
June 1999 - New exit stairs for Kendrick Garage completed - Rebar for
form work for column
cages for structural piers delivered June 7 - Concrete pour for grade
beams, tie beam sand pier
caps June 18 - Soil removal and grading ongoing from June 21 -
Drilling of additional
structural piers ongoing.
|
|
|
|
April - May
1999
- Construction underway: Demolition to Kendrick Hall to make room for
future stairway. Drilling Piers and placing rebar - Actual Groundbreaking: Monday
April 6,
1999.
Groundbreaking Ceremony March 26, 1999