Summer 2012

  • CSI - On-going construction
  • Harney - chiller replacement
  • Phelan renovations / improvements
  • Gleeson/Geschke - Rare book room renovations
  • Gleeson/Geschke - COGEN office upgrades
  • University Center - 2nd floor faculty / staff dining room renovation
  • University Center - 3rd floor CASA renovation
  • Zief Libray - TI projects
  • Lone Mountain - Spanish Step planter replacement
  • Lone Mountain - 1st floor bathrooms refresh
  • Lone Mountain - office 102 remodel
  • Koret - Exercise equipment replacement
  • Koret - Climbing Rope system install
  • Campus signage updates
  • Baseball Fence
  • Baseball field - Painting of the poles
  • Downtowwn Campus (101 Howard)- 4th floor renovations
  • Carpet and painting as necessary in dorrms
*PDF Version of 2012 Summer Project Map - CLICK HERE

USF 2012 SUMMER PROJECT LOGISTICS:

Summer 2012

VEHICLE TRAFFIC

  • No vehicle access to the center of campus via campus walk between Harney Science and Gleeson/Geschke Library 5/21-8/9
  • No vehicle access to the center of campus via campus walk between UC and Memorial Gym - 5/21-6/6
  • No vehicle or pedestrian access in Phelan alley and Phelan loading dock

PEDESTRIAN ACCESS

PHASE 1 - 5/21-6/6

  • Pedestrian access on campus walk between Harney Science and Gleeson/Geschke Library will use temporary path along work zone. The path will continue on Gleeson lawn to Kalmanovitz.
  • The center of campus and main campus walk will be open and accessible.
  • Campus walk between UC and Memorial Gym will be accessible using sidewalk along Memorial Gym.

PHASE 2 - 6/7-8/9

  • Pedestrian access on campus walk between Harney Science and Gleeson/Geschke Library will use temporary path along work zone. The path will continue on Gleeson lawn to Kalmanovitz.
  • Center of campus and main campus walk will be closed to all pedestrian traffic from Kalmanovitz (breezeway) to Cowell main entrance.
  • Access to Kalmanovitz, UC and the center of campus from Gleeson Plaza will be through Kalmanovitz, and Cowell Hall.
  • Pedestrian access to Cowell Hall main entrance via temporary walkway along work zone.

ACCESSIBLE ROUTES:

PHASE 1:

  • Traveling to center of campus, all buildings and routes are accessible, except the campus walk between Harney Science and Gleeson/Geschke Library.
  • Travel at UC and Memorial gym is accessible using sidewalk along Memorial gym.

PHASE 2:

  • The main campus walk will be closed at the center of campus to all access - between the breezway at Kalmanovitz hall and the Cowell main entrance.
  • Accessible detour routes to the center of campus from Gleeson Plaza is through the first westerly Kalmanovitz entance. Please use elevator to the ground floor and travel out the back entrance to the ground level entrance of Cowell Hall. Use Cowell Hall elevator to the first floor and then access the center of campus using the Cowell Hall Main entrance
  • Access to Gleeson Plaza and Kalmanovitz from Golden Gate Ave is via path between Fromm Hall and Gleeson/Geschke Library